"The Fire In The Monster" Powerplant Chapter Two, Engine Top End And Leakdown
Our project takes shape!
May 2000 Update: Due to Relocating our Workshop, We have
postponed the next chapter in our project 'till June 2000. Thanks
for your paitience and Interest
As always we have a ton to cover, so I'm once
again gonna stick to the tips and tricks that will save you time
and aggravation. If I haven't mentioned it enough times already...
You should have your trusty manual close at hand to refer to!
Engine reassembly is nowhere near as complex as you might think but
you MUST have the proper tools and reference materials!
We sent the barrel out to Tudor's
Performance in Corona, CA to be ported, and polished.
Jeff Tudor recommends a mild level of porting ,as do we for a
reliable powerplant. LT500's produce enormous power as it is, and
unless you want to be overhauling your top end every weekend you
should stay away from the wild port jobs.
Here's a look at Jeff
Tudors work.
Intake port.
Intake side of
sleeve.
Polished exhaust port.
Time for the exhaust
power valve... Proper exhaust valve maintenance is a must to ensure
good high rpm performance. The Exhaust valve activates at
approximately 5,000 rpm and effectively changes the height of the
exhaust port during operation. This gives you the best of both
worlds, huge low range torque, combined with awesome high rev
scream for a big single.
With the
exhaust valve assembled we are ready to pop it in!